Contents

Home

About

Captain's Log

Projects

Guest Book

 


Alberg 35 Site

Alberg 35 Members

November 2010

2010/11/15 – Mast was unstepped and boat was hauled out. Bottom was washed and boat was positioned in cradle and staged for pickup by Lockview Marine.


2010/11/29 – Lockview Marine arrived in Watkins Glen at approximately 09:00 and began loading the boat for transport. Boat was secured by 10:00 and was trucked to Big Flats. The truck and trailer failed to negotiate the driveway, and therefore had to back down the side yard and put the boat near the end of the driveway along the fence. After being unloaded, the truck got stuck in the mud and we had to help pull it out with the Trailblazer.

Exhaust system and engine block were drained of water. Spark plugs were removed. Noted that cylinders 1 and 2 looked good, but 3 and 4 showed some fouling.

Next