Contents

Home

About

Captain's Log

Projects

Guest Book

 


Alberg 35 Site

Alberg 35 Members

April 2011

2011/04/14 – Cape Horn steering unit arrived via UPS. Box was left unopened and stored in the garage.

2011/04/17 – Cleaned out much of the garage to begin setting up the workshop in order to begin serious work on the boat. Opened up the Cape Horn box to inventory the contents and better understand what will be required during installation.

Over the next two weeks added two work benches to the shop and got the planer/joiner tuned up and running well. The belt sander is also fully operational and rewired with an on/off switch as well. (The latter might be useful to have, no?)


Previous | Next